Methodology · v.04

Four phases.
Zero shortcuts.

A predictable, transparent path from first conversation to move-in day. Each phase has clear deliverables, a fixed duration, and a defined exit point.

Phase
01
1–2 weeks

Brief

Workplace audit, employee survey, headcount forecast, and space utilisation study. We define the problem before we design the solution. The output is a detailed brief and a test-fit on your shortlisted property.

Deliverables

  • Workplace audit report
  • Headcount & growth model
  • Space utilisation analysis
  • Test-fit plan & budget
Phase
02
4–8 weeks

Design

Floor plans, 3D visualisation, material boards, and furniture schedules. We present two fully resolved design options, each with a fixed-price fit-out estimate. No vague concepts — every hinge is specified.

Deliverables

  • Design options × 2
  • 3D walkthrough & renders
  • Material & finish schedule
  • Furniture & joinery spec sheet
Phase
03
8–20 weeks

Build

Shell-to-handover fit-out under our project manager. We coordinate MEP, ceiling, partition, flooring, joinery, and AV as a single accountable contractor. Weekly site reviews with photo reports.

Deliverables

  • Weekly progress reports
  • MEP coordination drawings
  • Quality control checklists
  • snag list tracking
Phase
04
1–2 weeks

Handover

Defects resolution, final styling, furniture placement, and move-day support. We hand over a workspace that is ready for people to sit down and work — not a construction site with a certificate.

Deliverables

  • Defects clearance
  • As-built drawings
  • Maintenance manual
  • 12-month warranty
Note // 005

What we don't do.

We don't take on more than twelve projects a year. We don't bid against five other studios on price alone. We don't subcontract the critical path to the lowest bidder. And we don't begin without a workplace audit and a written brief.